Well Integrity Engineering - IFP Training Certificate
Graduate Certificate
WELINTE-EN-P
Who should attend?
This course provides in-depth technical knowledge of well integrity design, management, and maintenance in order to hold rapidly and very effectively, the position of field engineer, design engineer or project engineer.
Public :
Engineers (particularly recently graduated engineers or engineers in conversion) looking to acquire in-depth knowledge and best practices of Oil & Gas production.
Level :Knowledge
Prerequisite :
Engineering degree or equivalent professional experience within the petroleum industry.
Course Content
CASING DESIGN & APPLICABLE STANDARDS
-
Duration : 5 Days
Drilling and casing program, wellhead, characteristics of casing.
Shoe positioning: hypotheses to be considered, casing point. Kick tolerance, casing point. Kick tolerance & well integrity.
Casing String Calculation: principles and assumptions, stress cases study (collapse, burst, tension, triaxial study, safety factors).
Casing selection.
CEMENTING: PRIMARY & REMEDIAL, QUALITY CONTROL OF CEMENT
-
Duration : 5 Days
Techniques and job procedures: primary cementing, cement job design, job planning and preparation, casing running, cementing job, cementing calculations.
Cement and slurries: cement, special slurries and additives, formulation and laboratory tests, rheology of mud and slurries.
Cement job evaluation: principles and interpretation of the cement logs, thermometry, Sonic (CBL - VDL), Ultrasonic (USIT), log analysis on a real case.
WELL COMPLETION EQUIPMENT, DESIGN, ACCEPTANCE CRITERIA
-
Duration : 5 Days
Well completion equipment: functions to be carried out and corresponding equipment.
Production string(s) configurations (conventional or tubing less, single or multi-zones).
Production wellhead, tubing & connections, packers and accessories, bottom hole devices.
FLUIDS BEHAVIOR & FLOW ASSURANCE
-
Duration : 5 Days
Thermodynamic applied to well effluent.
Flow patterns, main considerations.
Deposits and sand production monitoring and maintenance.
Corrosion monitoring and maintenance.
WELL HEAD MAINTENANCE & WELL INTERVENTION
-
Duration : 5 Days
X-mas tree specifications: X-mas tree (natural flowing wells), gas well X-mas tree, requirement for materials, X-mas tree equipment and selection (MV, SSV, SV, WV, choke).
Wellhead monitoring and maintenance: Wellhead installation procedures, Wellhead protection during well intervention (pre-job and post job), Surface equipment monitoring maintenance, function tests, pressure test, plan & execute maintenance. Well reinstatement.
Mains types of intervention: measurement, maintenance, workover.
Main means (wireline unit, coiled tubing unit, snubbing unit, workover rig): principles, area of application, general procedures & well killing procedures & calculations.
WELL INTEGRITY MANAGEMENT
-
Duration : 5 Days
Well integrity management system: introduction, assets, organization and people, WI Direction.
Well integrity design and standards; well construction/completion
Well barriers: definition, requirement & design. Wellhead and tree equipment: valves, seals, accessories, Safety valves: downhole, surface. Leak detection.
Minimum integrity requirements vs. well life cycle/phases.
Role and responsibilities over the various operational life of the well.
WELL INTEGRITY PROJECT
-
Duration : 5 Days
Project & presentation in front of a jury: the trainees perform a well integrity review on a drilling & completion project provided by IFP Training.
Verification of casing design & selection.
Verification of completion design & material selection (tubing, SCSSV, well head & accessories).
Surface & subsurface well integrity tests
Presentation in front of a jury.
Learning Objectives
Attendees will be able to implement the following skills:
Calculate different casing strings applying well integrity roles,
Select the right position of casing shoes to safely drill the well,
Select the casings as per the constraints encountered while drilling in order to maintain the well integrity,
Design primary cementing techniques and procedures and select cement and necessary additives,
Assess the quality of a cementing job and which equipment is required in a conventional case,
Design the corresponding completion safe procedures calculate tubing movement and forces,
Work on complex completion issues with specialists and select the wellhead according to operational conditions,
Write and supervise maintenance and testing procedures on wellhead,
Recognize the technical, operational and organizational solutions applied to well integrity management,
Design the process of well integrity management and review well integrity within the framework of all strategic operations.
Ways & Means
Highly interactive training with industry specialist lecturers.
Multiple teamwork sessions and industrial case studies.
Numerous animations & videos.
Knowledge assessment on a weekly basis.
Learning assessment
Quiz.
More
Coordinator :IFP Training instructors, with expertise in the field and trained in modern teaching methods adapted to the specific needs of learners from the professional world.
To French entities : IFP Training is referenced to DataDock ; you may contact your OPCO about potential funding.
Please contact our disabled persons referent to check the accessibility of this training program : referent.handicap@ifptraining.com