Well Integrity Engineering - IFP Training Certificate

Graduate Certificate
WELINTE-EN-P

Who should attend?

  • This course provides in-depth technical knowledge of well integrity design, management, and maintenance in order to hold rapidly and very effectively, the position of field engineer, design engineer or project engineer.
Public :
  • Engineers (particularly recently graduated engineers or engineers in conversion) looking to acquire in-depth knowledge and best practices of Oil & Gas production.

Level :Knowledge

Prerequisite :
  • Engineering degree or equivalent professional experience within the petroleum industry.

Course Content

  • CASING DESIGN & APPLICABLE STANDARDS - Duration : 5 Days

      • Drilling and casing program, wellhead, characteristics of casing.
      • Shoe positioning: hypotheses to be considered, casing point. Kick tolerance, casing point. Kick tolerance & well integrity.
      • Casing String Calculation: principles and assumptions, stress cases study (collapse, burst, tension, triaxial study, safety factors).
      • Casing selection.
  • CEMENTING: PRIMARY & REMEDIAL, QUALITY CONTROL OF CEMENT - Duration : 5 Days

      • Techniques and job procedures: primary cementing, cement job design, job planning and preparation, casing running, cementing job, cementing calculations.
      • Cement and slurries: cement, special slurries and additives, formulation and laboratory tests, rheology of mud and slurries.
      • Cement equipment: pumps, mixers, cementing head, cement plugs.
      • Cement job evaluation: principles and interpretation of the cement logs, thermometry, Sonic (CBL - VDL), Ultrasonic (USIT), log analysis on a real case.
  • WELL COMPLETION EQUIPMENT, DESIGN, ACCEPTANCE CRITERIA - Duration : 5 Days

      • Well completion equipment: functions to be carried out and corresponding equipment.
      • Production string(s) configurations (conventional or tubing less, single or multi-zones).
      • Production wellhead, tubing & connections, packers and accessories, bottom hole devices.
      • Subsurface safety valve (subsurface controlled, surface controlled).
      • Calculation of tubing movement and forces.
      • Well completion preparation and Implementation.
  • FLUIDS BEHAVIOR & FLOW ASSURANCE - Duration : 5 Days

      • Thermodynamic applied to well effluent.
      • Flow patterns, main considerations.
      • Deposits and sand production monitoring and maintenance.
      • Corrosion monitoring and maintenance.
  • WELL HEAD MAINTENANCE & WELL INTERVENTION - Duration : 5 Days

      • X-mas tree specifications: X-mas tree (natural flowing wells), gas well X-mas tree, requirement for materials, X-mas tree equipment and selection (MV, SSV, SV, WV, choke).
      • Wellhead monitoring and maintenance: Wellhead installation procedures, Wellhead protection during well intervention (pre-job and post job), Surface equipment monitoring maintenance, function tests, pressure test, plan & execute maintenance. Well reinstatement.
      • Mains types of intervention: measurement, maintenance, workover.
      • Main means (wireline unit, coiled tubing unit, snubbing unit, workover rig): principles, area of application, general procedures & well killing procedures & calculations.
  • WELL INTEGRITY MANAGEMENT - Duration : 5 Days

      • Well integrity management system: introduction, assets, organization and people, WI Direction.
      • Well integrity design and standards; well construction/completion
      • Well barriers: definition, requirement & design. Wellhead and tree equipment: valves, seals, accessories, Safety valves: downhole, surface. Leak detection.
      • Minimum integrity requirements vs. well life cycle/phases.
      • Annulus pressure management. Plug & Abandon, Handover.
      • Role and responsibilities over the various operational life of the well.
  • WELL INTEGRITY PROJECT - Duration : 5 Days

      • Project & presentation in front of a jury: the trainees perform a well integrity review on a drilling & completion project provided by IFP Training.
      • Verification of casing design & selection.
      • Verification of completion design & material selection (tubing, SCSSV, well head & accessories).
      • Surface & subsurface well integrity tests
      • Presentation in front of a jury.

Learning Objectives

  • Attendees will be able to implement the following skills:
  • Calculate different casing strings applying well integrity roles,
  • Select the right position of casing shoes to safely drill the well,
  • Select the casings as per the constraints encountered while drilling in order to maintain the well integrity,
  • Design primary cementing techniques and procedures and select cement and necessary additives,
  • Assess the quality of a cementing job and which equipment is required in a conventional case,
  • Design the corresponding completion safe procedures calculate tubing movement and forces,
  • Work on complex completion issues with specialists and select the wellhead according to operational conditions,
  • Write and supervise maintenance and testing procedures on wellhead,
  • Recognize the technical, operational and organizational solutions applied to well integrity management,
  • Design the process of well integrity management and review well integrity within the framework of all strategic operations.

Ways & Means

  • Highly interactive training with industry specialist lecturers.
  • Multiple teamwork sessions and industrial case studies.
  • Numerous animations & videos.
  • Knowledge assessment on a weekly basis.

Learning assessment

  • Quiz.

More

Coordinator :IFP Training instructors, with expertise in the field and trained in modern teaching methods adapted to the specific needs of learners from the professional world.

To French entities : IFP Training is referenced to DataDock ; you may contact your OPCO about potential funding. Please contact our disabled persons referent to check the accessibility of this training program : referent.handicap@ifptraining.com