Module 2: Oil & Water Processing

Sizing - Simulation - Operation
ADV2-EN-P

Who should attend?

  • This course provides a comprehensive understanding of oil and water treatment processes, operation and troubleshooting.
Public :
  • Engineers involved in operating or designing oil and water field processing facilities.

Level :Skilled

Prerequisite :
  • To attend Module 1 or engineer degree or equivalent experience in Oil & Gas industry.

Course Content

  • NEED FOR OIL FIELD PROCESSING - QUALITY REQUIREMENTS - Duration : 0.25 Day

      • Constituents raising problems for storage, transport, or crude oil sale.
      • Different specifications and quality requirements of crude oils.
      • Necessary treatments to reach these specifications.
      • Examples of compositions of commercialized crude oils.
  • CRUDE OIL TREATMENT - Duration : 2.75 Days

      • Crude stabilization by Multi Stage Separation (MSS):
      • Process principle.
      • Operating parameters: number of separation stages, pressures, heating and cooling needs… - Influence on the quantity and quality (API grade) of the produced oil.
      • Foaming problems and main available solutions.
      • Associated gas recompression - Typical associated gas compression schemes.
      • Applications: practice of separator summary design methods.
      • PRO/II™ simulation: study of the influence of separation stage number on the performances of a MSS process.
      • Crude dehydration and desalting:
      • Emulsion problems.
      • Main dehydration processes.
      • Crude oil desalting.
      • Applications: practice of desalter summary design methods.
      • Acid crude sweetening (H2S removal):
      • Cold stripping: origin of stripping gas, need for sweetening of stripping gas.
      • Hot stripping.
      • Applications: practice of stripping column summary design methods.
      • PRO/II™ simulation: simulation of a crude oil stripping units case study.
      • Case study: simulation of a whole crude oil field treatment plant; study of an offshore crude oil field treatment unit, based on a Multiple Stage Separation (MSS) process scheme; optimization of the operating parameters.
  • STORAGE EQUIPMENT - Duration : 0.5 Day

      • Atmospherics tanks.
      • Case of floating storage vessels (FSO, FPSO).
      • Maintenance and operation.
  • PRODUCTION WATER TREATMENT - Duration : 0.5 Day

      • Regulations for disposal.
      • Main treatments. Operating principle and required performances.
      • Comparison of the different available techniques. Selection criteria.
      • Examples of production water treatment block flow diagrams.
  • INJECTION WATER TREATMENT - Duration : 1 Day

      • Reasons for water injection.
      • Quality requirements and necessary treatments.
      • Main operating conditions of each treatment and required performances.
      • Examples of injection water treatment block flow diagrams.

Learning Objectives

  • Attendees will be able to implement the following skills:
  • Master oil and water treatment processes, operations and related operating conditions,
  • Design main equipment used for oil processing,
  • Troubleshoot main operating problems encountered in oil and water processing and related solutions,
  • Simulate crude oil treatment processes using the PRO/II™ software.

Ways & Means

  • Highly interactive training with industry-specialist lecturers.
  • Numerous applications and illustrations.
  • Extensive practice of PRO/II™ process simulation software.

Learning assessment

  • Assessment by test at the end of the course.

More

Coordinator :IFP Training trainer (permanent or contracted) having a good expertise and/or experience of the related topics, trained to adult teaching methods, and whose competencies are kept up-to-date.

To French entities : IFP Training is referenced to DataDock ; you may contact your OPCO about potential funding. Please contact our disabled persons referent to check the accessibility of this training program : referent.handicap@ifptraining.com