Well Productivity & Reservoir - Wellbore Interface

PPLCT-EN-P

Who should attend?

  • This course provides the knowledge and skills needed to optimize the reservoir-wellbore interface and well productivity.
Public :
  • Young engineers involved in drilling/completion, supervisors in charge of drilling pay zone, and production professionals concerned with well productivity.

Level :Knowledge

Prerequisite :
  • Basics of drilling, completion operations, well performance and/or production engineering.

Course Content

  • NECESSARY FUNDAMENTALS OF RESERVOIR ENGINEERING FOR COMPLETION - Duration : 1 Day

      • Main parameters about the rock-fluid couple: porosity, permeability, saturation.
      • Means of reservoir knowledge: core, logging, well test.
      • PVT study: PV diagram, PT diagram, terminology (bubble point, dew point, Rs, Bo, Bg, GOR, WOR…).
      • Drainage mechanisms: primary, secondary and enhanced recovery.
  • COMPLETION FUNDAMENTALS - Duration : 0.5 Day

      • Completion: operations involved, main phases.
      • Main factors influencing completion design.
      • Completion configurations: fundamental requirements, main configurations.
      • Main completions of gas storage wells and Geothermal wells
  • WELL PRODUCTIVITY (Part 1) - Duration : 1 Day

      • Fundamentals: overall approach of the well flow capacity:
      • Inflow (study of the bottom hole pressure from the upstream side): main parameters, Productivity Index (PI), global skin and flow efficiency.
      • Outflow (study of the bottom hole pressure from the downstream side): case of oil wells and case of gas wells.
      • Analysis of inflow and outflow performance curves, need for artificial lift.
  • RESERVOIR WELLBORE INTERFACE IMPLEMENTATION (excluding “Wellbore treatments”) - Duration : 1 Day

      • Specific aspects linked to drilling and cementing the pay zone.
      • Perforating: main techniques, key parameters for productivity.
      • Specific case of horizontal drains.
  • WELL PRODUCTIVITY (Part 2) - Duration : 1 Day

      • Additional information about PI:
      • Productivity index and flow regime.
      • Inflow performance below bubble point pressure (IPR).
      • Additional information about skin:
      • Components of completion skin.
      • Damage skin estimation.
  • KNOWLEDGE ASSESSMENT

Learning Objectives

  • Attendees will be able to implement the following skills:
  • select a reservoir-wellbore interface adapted to the conditions encountered in the reservoir,
  • detect problems holding down productivity and select adequate solutions,
  • determine the flow potential of the well,
  • understand the different perforation methods & their selections,
  • perform a design of tubing diameter according to production objectives.

Ways & Means

  • Numerous exercises on the influence of key parameters.
  • Numerous animations and videos.
  • Summary notes prepared and presented by the participants.
  • Application to a real case (project) for the participants in the “Drilling & Completion Engineering” training course.

Learning assessment

  • Quiz.

More

Coordinator :IFP Training instructors, with expertise in the field and trained in modern teaching methods adapted to the specific needs of learners from the professional world.

To French entities : IFP Training is referenced to DataDock ; you may contact your OPCO about potential funding. Please contact our disabled persons referent to check the accessibility of this training program : referent.handicap@ifptraining.com